Completed Projects

Replace Power Generation System – Safaniyah Area
(Saudi Aramco / Larsen & Toubro LLC)


PROJECT BI # 10-01247-0004

PROJET LOCATION : Safaniyah Plant, Sub Station 2, Marjan

SCOPE OF WORK : Connectivity of the following;
  • Connectivity between new substation # 2 (230kv) with Safaniyah BSP substation, existing substation # 1 (115kv) and Submarine cable at Gantry 4
  • FOC connectivity between new substation # 2 (230kv) with
  • FOC connectivity inside new substation # 2 (230kv) between PSA Panels and Relay Panels
  • FOC connectivity inside existing substation # 1 (115kv) between PSA Panel and Telecom Room (TER)
  • FOC patching, testing (OTDR, Power Meter & Light Source and CD/PMD) and commissioning of FOC between new substation # 2 and Safaniyah DCO

FOC connectivity of New Drill sites with SCADA through FOC
(Saudi Aramco / EES-OM)


PROJET LOCATION : Manifa COSWAY Drill site # 3, 8,9,1,13,17,18,19,20

SCOPE OF WORK : Fiber optic connectivity of the following;
  • Excavation and ductbank installation
  • FOC cable laying from the drill site till RTU shelter
  • Copper and FOC cable pulling
  • FOC splicing and testing (OTDR, Power Meter & Light Source and CD/PMD)
  • FOC patching, testing and commissioning of FOC

FOC connectivity of Oil
(Saudi Aramco / IICS Ltd.)


PROJECT BI # 10-00452-0005

PROJET LOCATION : Manifa and Tanajib TB-10, 11, 17/22 and DS-31, 30, 35, 36

SCOPE OF WORK : Fiber optic connectivity of the following;
  • FOC Drum testing with OTDR
  • FOC Post installation testing with OTDR
  • Splicing and Termination of FOC
  • End to End testing (OTDR, Power Meter & Light Source and CD/PMD)
  • FOC patching, testing and commissioning of FOC

FOC connectivity and Data connectivity At PMT temporary Office
(Saudi Aramco / Larson & Toubro LLC)


PROJECT BI # 10-01247-0004

PROJET LOCATION : Safaniyah DCO / Marjan site

SCOPE OF WORK : Fiber optic connectivity of the following;
  • Hand Excavation and cable pulling
  • FOC cable laying from DCO to PMT office
  • FOC Drum and Post installation testing with OTDR
  • FOC splicing/termination and testing (OTDR, Power Meter & Light Source and CD/PMD)
  • FOC patching, testing and commissioning of FOC

FOC connectivity of gas Wellhead
(Saudi Aramco / Nesma)


PROJECT BI # 10-00060-4331-001

PROJET LOCATION : Uthmaniyah

SCOPE OF WORK : Fiber optic connectivity of the following;
  • Trench excavation and ductbank installation
  • FOC cable laying
  • FOC Drum and Post installation testing with OTDR
  • FOC splicing/termination and testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning of FOC

FOC connectivity at gas Wellhead
(Saudi Aramco / Nesma)


PROJECT BI # 10-03401-2005

PROJET LOCATION : Abu Hadriyah

SCOPE OF WORK : Fiber optic connectivity of the following;
  • Trench excavation and ductbank installation
  • FOC cable laying
  • FOC Drum and Post installation testing with OTDR
  • FOC splicing/termination and testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning of FOC

FOC re-routing of gas Well
(Saudi Aramco / MACE)


PROJECT BI # 10-00040-4501

PROJET LOCATION : Abu Hadriyah

SCOPE OF WORK : Fiber optic connectivity of the following;
  • FOC re-routing, wellpad extension of wellhead # ABHD-130 and ductbank installation
  • FOC cable laying
  • FOC Post installation testing with OTDR
  • FOC splicing/termination and testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning of FOC

FOC connectivity of Gas Wells
(Saudi Aramco / MACE)


PROJECT BI # 10-3006-9201

PROJET LOCATION : Fadhly / khursaniyah

SCOPE OF WORK : Fiber optic connectivity of the following;
  • Cabinet and RTU Installation
  • FOC Drum/Post installation testing with OTDR
  • Configuration, energization and connectivity of the equipment
  • FOC splicing and termination testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning of FOC

FOC connectivity of gas Wells
(Saudi Aramco / Nesma)


PROJECT BI # 10-3006-9201

PROJET LOCATION : Uthmaniyah / udhailiyah

SCOPE OF WORK : Fiber optic connectivity of the following;
  • Complete Electrical & Instrumentation work and trenching, foc cable laying, duct bank installation
  • FOC Drum/Post installation testing with OTDR
  • FOC splicing and termination
  • End to End testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning of FOC

HRDH Evaluation Well HRDH-282
(Saudi Aramco / Al-Robaya Holding)


PROJECT BI # 10-01277-6323

PROJET LOCATION : Haradh

SCOPE OF WORK : Fiber optic connectivity and Electrical & Instrumentation work of the following;
  • Trench excavation of total length 1.357km with ductbank installation
  • FOC cable laying and backfilling with warning tape and marker post installation
  • Installation of RTU, Pressure Indicator Transmitor, Tubing, Lighting, PDHMS
  • Grounding Installation, Electrical and Instrument cable laying with termination
  • FOC Drum testing, splicing/termination and end to end testing, pre-commissioning and commissioning

Oil Well
(Saudi Aramco / Al-Robaya Holding)


PROJECT BI # 10-01433-7185

PROJET LOCATION : Haradh

SCOPE OF WORK : Electrical and Instrumentation work of the following;
  • Trench excavation
  • Electrical & Instrument cable laying and backfilling with warning tape installation
  • Installation of PDHMS
  • Grounding Installation, Electrical and Instrument cable termination
  • Pre-commissioning and commissioning

Gas Wells
(Saudi Aramco / Al-Robaya Holding)


PROJECT BI # 10-01433

PROJET LOCATION : Haradh

SCOPE OF WORK :FOC connectivity of the following;
  • Trench excavation and ductbank installation
  • FOC drum testing, FOC laying and backfilling with warning tape and marker post installation
  • TER installations
  • FOC splicing/termination and End to End testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning

Gas Wells
(Saudi Aramco / Al-Robaya Holding)


PROJECT BI # 10-01277

PROJET LOCATION : Haradh

SCOPE OF WORK :FOC connectivity of the following;
  • Trench excavation and ductbank installation
  • FOC drum testing, FOC laying and backfilling with warning tape and marker post installation
  • TER installations
  • FOC splicing/termination and End to End testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning

Oil Wells
(Saudi Aramco / Al-Robaya Holding)


PROJECT BI # 11-18000-8302

PROJET LOCATION : Harmaliyah-76

SCOPE OF WORK :FOC connectivity of the following;
  • Trench excavation and ductbank installation
  • FOC drum testing, FOC laying and backfilling with warning tape and marker post installation
  • FOC splicing/termination
  • End to End testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning

Gas Well HRDH-2241
(Saudi Aramco / Kentz)


PROJECT BI # 10-01433-7804

PROJET LOCATION : Hawaiyah

SCOPE OF WORK :FOC connectivity of the following;
  • Trench excavation and ductbank installation
  • FOC drum testing, FOC laying and backfilling with warning tape and marker post installation
  • FOC splicing/termination
  • End to End testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning

Gas Well
(Saudi Aramco / Nesma)


PROJECT BI # 10-01277-6517

PROJET LOCATION : Utmaniyah

SCOPE OF WORK : Fiber optic connectivity and Electrical & Instrumentation work of the following;
  • Trench excavation with ductbank installation
  • FOC cable laying and backfilling with warning tape and marker post installation
  • Installation of RTU, Pressure Indicator Transmitor, Tubing, Lighting, PDHMS
  • Grounding Installation, Electrical and Instrument cable laying with termination
  • FOC Drum testing, splicing/termination and end to end testing, pre-commissioning and commissioning